Meridian HV Solutions · D-TX-2026-0047 · 28 pages12345678910111213141516171819202122232425262728
MH
Meridian HV Solutions
Bid submission
D-TX-2026-0047
Tender Bid Submission

Supply & Delivery of 132/33 kV Power Transformers — Five (5) Units

Meridian HV Solutions · China
Submitted to
ACME · Procurement Department
PO Box 219, Abu Dhabi, UAE
Issued by
Meridian HV Solutions
Wang Jianmin
intl@meridian-hv.com
Submission date
28 April 2026
Bid validity
120 days from closing
Confidential · for ACME procurement evaluation intl@meridian-hv.com

Letter of Submission

To: Eng. Aisha Al-Mansoori
Senior Procurement Lead — Transmission
ACME, Abu Dhabi, UAE

Re: RFQ D-TX-2026-0047 — Supply & Delivery of 132/33 kV Power Transformers

Dear Eng. Al-Mansoori,

We are pleased to submit our bid for the supply and delivery of five (5) 132/33 kV, 40 MVA, oil-immersed power transformers in response to the Request for Quotation referenced above. Our submission has been prepared in full conformance with the structure of the RFQ, with a clause-by-clause Compliance Statement provided in Section 4 of this document.

Meridian HV Solutions confirms its commitment to the technical specification under §3 of the RFQ, the Commercial requirements under §6, and the HSE and ICV obligations under §§7 and 8. Our delivery commitment is 30 weeks ARO, our lump-sum bid is AED 9,410,000.00, and our offer is valid for 120 days from the closing date.

We confirm that the information contained in this submission is accurate to the best of our knowledge, and that Meridian HV Solutions is duly authorised to enter into a contract on the terms set out herein. We look forward to the opportunity to support ACME’s Northern Grid expansion programme.

Yours sincerely,

Wang Jianmin
Authorised Signatory · Meridian HV Solutions
Confidential · for ACME procurement evaluation intl@meridian-hv.com

Executive Summary

Meridian HV Solutions is pleased to offer five (5) 132/33 kV, 40 MVA, ONAN/ONAF cooled, two-winding, three-phase oil-immersed power transformers, vector group Dyn11 (alt. — non-compliant), in conformance with ACME specification S-ELE-TRF Rev 4 and the IEC 60076 series.

Headline numbers

Lump-sum bidAED 9,410,000.00
Per unitAED 1,882,000.00
Lead time30 weeks ARO
ICV score22.0%
Bid validity120 days from RFQ closing
Payment terms30/65/5
Warranty2 years from SAT

Why Meridian HV Solutions

Our offer combines (a) compliance with the ACME technical envelope, (b) full IEC 60076-1/2/3 type test cover, and (c) a delivery slot already reserved in our manufacturing schedule. Our project team, led by Wang Jianmin, has prior experience delivering 132 kV-class transformers on regional networks. Section 11 lists our reference projects.

Bid roadmap

This document is structured as follows: §4 Compliance Statement, §5 Technical Proposal, §6 Type Tests, §7 Manufacturing & FAT, §8 Commercial Proposal, §9 BoQ, §10 Delivery Schedule, §11 Reference Projects, §12 ICV, §13 HSE, §14 Method Statements, §15 Personnel CVs, §16 Bond, §17 Warranty, §18 Appendices.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 4 · Compliance Statement

The Supplier confirms its compliance with §3 of the RFQ on a clause-by-clause basis as follows.

ClauseTopicStatusVendor note
§3.1 Vector group YNd11 Deviate Dyn11 (alt. — non-compliant) offered as alternative.
§3.2 Cooling class ONAN/ONAF Comply ONAN/ONAF — 100% rated capacity at ONAN.
§3.3 Insulation system Comply Inhibited mineral oil per IEC 60296.
§3.4 BIL HV 650 / LV 170 kVp Comply 650 / 170 kVp.
§3.5 Losses (NLL ≤ 28 / LL ≤ 165 kW) Comply (penalty) 28.9 kW NLL / 169.5 kW LL @ 75 °C.
§3.6 Short-circuit impedance 12.5% ± 7.5% Comply Within tolerance band.
§3.7 Bushing — OIP per IEC 60137 Comply OIP HV / Porcelain LV
§3.8 Tap changer ±9 × 1.25% Comply OLTC, vacuum interrupter, motor-driven.
§3.9 FAT per IEC 60076-1 §10 Comply Witness welcomed at routine + impulse + SC.
§3.10 Environmental (50 °C, dust class B) Comply Designed for the UAE envelope.
Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 4 · Compliance Statement (continued)

ClauseTopicStatusVendor note
§5 Submission requirements Comply All sections per §5 included.
§5(b) Compliance statement Comply This document, §4.
§5(c) Technical proposal Comply §5–§7 of this submission.
§5(d) Type test reports Comply XJTU HV Lab Xi'an — MH-XJTU-22-1411 (14 March 2024).
§5(e) Bill of quantities Comply §9 of this submission.
§5(f) Delivery schedule Comply §10 of this submission.
§5(g) Reference projects Comply §11 of this submission.
§5(h) Valid ICV certificate Partial Score 22.0% — Cert ICV-AE-2025-MH-0917.
§5(i) Method statements Comply §14 of this submission.
§5(j) Personnel CVs Comply §15 of this submission.
§6 Commercial requirements Comply Acknowledged. Payment per §6 of RFQ.
§7 HSE Comply ISO 45001 / 14001 cover; method statements §14.
§8 ICV Partial Below threshold; uplift partner under negotiation.

Where "Partial" or "Not submitted" is marked, the Supplier confirms its commitment to provide the requested item at contract execution stage and to engage with ACME’s Procurement Lead within 14 days of any clarification request.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 5 · Technical Proposal — Overview

The transformer offered is a 132/33 kV, 40 MVA, three-phase, two-winding, oil-immersed power transformer. Vector group Dyn11 (alt. — non-compliant). ONAN/ONAF cooling (100% capacity at ONAN). Designed for ambient conditions of 50 °C max., humidity 95%, sand and dust class B per IEC 60721-3-3.

Voltage ratio132 ± 9×1.25% / 33 kV
Rated power40 MVA (ONAN) / 40 MVA (ONAF)
Frequency50 Hz
Vector groupDyn11 (alt. — non-compliant)
ConnectionHV: Star, neutral brought out · LV: Delta
Oil typeInhibited mineral oil per IEC 60296
Insulation systemClass A, paper-oil insulated
Cooling fans2 banks of 4 fans per unit; staged duty
Footprint5,400 × 3,500 mm (LxW), 4,300 mm overall height
Total weight62 tonnes (with oil), 48 tonnes (without)

Design philosophy

The design follows our established 132 kV-class platform with a copper-strip continuously-transposed-conductor (CTC) HV winding, a CTC LV winding, and a 5-leg core-form magnetic circuit. The conservator is air-cell type with desiccant breather. Pressure relief is via spring-loaded valve with electrical contact to SCADA.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 5.1 · Core & Windings

Core: 5-leg core-form, grain-oriented silicon steel laminations, mitred and step-lapped. Flux density 1.62 T at rated voltage. Stress-relieved.

HV winding: Copper-strip CTC, paper-insulated. Disc-type construction with interleaving for impulse stress distribution.

LV winding: Helical CTC. Concentric to the HV winding.

Tap changer: On-load, vacuum interrupter, motor-driven, ±9 × 1.25%, located on HV winding. Make/model: see §5.4 below.

Vector groupDyn11 (alt. — non-compliant)
BIL HV / LV650 / 170 kVp
Short-circuit impedance12.4% on principal tap
Tap range±9 × 1.25% (HV)
Tap changerReinhausen MS III on-load
Insulation levelClass A, ester-resistant
Conductor classCopper, CTC, paper insulated

Note on impedance tolerance: Our guaranteed value of 12.4% sits comfortably inside the ±7.5% tolerance band of §3.6, leaving margin for fault-level studies under future loading.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 5.2 · Bushings

The bushing technology offered for this contract is summarised below.

HV bushingsOIP HV / Porcelain LV
HV rated voltage145 kV / 800 A min.
LV rated voltage36 kV / 1250 A min.
Bushing manufacturerShanghai HV Bushing Co.
IEC referenceIEC 60137:2017
Tap-out provisionsCapacitance and dissipation factor tap (HV)

OIP bushings are the standard offering on our 132 kV-class transformer line, with all type tests for the bushing-transformer interface conducted at XJTU HV Lab Xi'an.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 5.3 · Cooling & Losses

Cooling system: ONAN/ONAF — 2 cooler banks of 4 fans each, sequenced by oil and winding temperature. Stage 1 fans engage at 70 °C top oil; Stage 2 at 80 °C.

Guaranteed losses

No-load loss (NLL)28.9 kW (above spec, penalty applies)
Load loss (LL) @ 75 °C169.5 kW (above spec, penalty applies)
Total losses @ rated198.4 kW
Reference temperature75 °C
Penalty rate (NLL)AED 18,000 per kW
Penalty rate (LL)AED 8,500 per kW

Losses are guaranteed values, measured at the FAT in accordance with IEC 60076-1 §11.4 (no-load loss) and §11.5 (load loss). Penalty rates apply if measured values exceed guaranteed values; bonus rates do not apply.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 5.4 · Protection & Monitoring

Buchholz relayTwin-float, gas-collection chamber, alarm + trip contacts
Pressure reliefSpring-loaded, indicator + electrical contact
Oil temperature indicator (OTI)Pt-100 sensors with SCADA interface
Winding temperature indicator (WTI)Image method, calibrated against thermal model
Online DGAContinuous monitoring with DNP3 / IEC 61850 reporting
Tap-changer monitoringContact wear, drive torque, position indicator
Marshalling kioskIP55, fan-cooled, with interposing relays

Communications

The integrated marshalling kiosk supports both DNP3 v3 and IEC 61850 Edition 2.1 with goose subscriptions. The protection & control interface terminates on a fibre patch panel for connection to the substation SAS. SBOM disclosure is available on request under NDA.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 6 · Type Test Reports

Type tests are conducted on the type-design transformer offered for this contract at the testing facilities of XJTU HV Lab Xi'an. The reports are available for review on request.

Test laboratoryXJTU HV Lab Xi'an
Test report no.MH-XJTU-22-1411
Test date14 March 2024
Coverage — IEC 60076-1Routine + temperature rise (Yes)
Coverage — IEC 60076-2Yes
Coverage — IEC 60076-3Lightning impulse · switching impulse (Yes)
Coverage — IEC 60076-5Pending — to be witnessed at FAT
Witness availableYes — ACME witness welcomed
Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 6.1 · Quality & HSE Certifications

StandardStatusIssued byIssued
ISO 9001:2015 — QMSActiveTÜV2024
ISO 14001:2015 — EMSActiveTÜV2024
ISO 45001:2018 — HSMSRenewalBV2024

Copies of the above certificates are available on request. Renewal cadence is tracked in our QMS document control system, Meridian HV Solutions Document Control SOP-08.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 7 · Manufacturing Plan

The transformers will be manufactured at our principal works in China. The manufacturing plan is summarised below; the full Gantt chart is provided in §10.

WkMilestoneStatus gate
1–4Engineering — design freeze, approval drawings to ACMEDrawings approval gate
5–8Material procurement — core steel, copper, oil, bushingsMaterial PO gate
9–14Core assembly & winding manufactureInternal QC gate
15–18Tank fabrication, accessory fitment, oil fillingPre-FAT inspection
23–26Factory Acceptance Test (ACME witnessed)FAT certificate
27–29Packaging, transportation prep, port handoverLogistics handover
30Delivery to Northern Grid SS, Al WathbaSite receipt
Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 7.1 · Factory Acceptance Test (FAT) Plan

FAT is conducted in accordance with IEC 60076-1 §10 at our principal works. ACME’s nominated witness representatives are welcome on the dates set out below.

FAT stepIEC referenceACME witness?
Insulation resistance & ratioIEC 60076-1 §11.1Yes
Winding resistanceIEC 60076-1 §11.2Yes
No-load loss measurementIEC 60076-1 §11.4Yes — guaranteed value test
Load loss & impedanceIEC 60076-1 §11.5Yes — guaranteed value test
Lightning impulse withstandIEC 60076-3 §13Yes
Switching impulse withstandIEC 60076-3 §14Yes
Temperature rise (representative unit)IEC 60076-2Optional
Short-circuit withstandIEC 60076-5Optional (3rd-party type-test)

FAT witness travel and accommodation are organised by the ACME team. Vendor support is provided at no additional cost to two witness representatives for up to five business days.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 8 · Commercial Proposal

Lump-sum bidAED 9,410,000.00
Per unitAED 1,882,000.00
CurrencyAED, fixed-price
Validity period120 days from RFQ closing
IncotermsFOB Shanghai
Payment terms30/65/5 (advance / milestones / SAT)
Performance bond10% of contract value, valid through warranty + 30 days
Liquidated damages0.1% per week of delay, capped at 10%
Liability cap100% of contract value (excluding wilful misconduct & IP)

Commissioning support

Meridian HV Solutions provides a 5-day on-site commissioning engineer at the day-rate set out in §9 BoQ Item 5. Additional commissioning support is available on request.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 9 · Bill of Quantities

#ItemQtyUnitUnit price (AED)Line total (AED)
1132/33 kV, 40 MVA, ONAN/ONAF, Dyn11 (alt. — non-compliant) power transformer — complete5ea1,467,960.007,339,800.00
2Standard accessories: conservator, breather, OTI/WTI, marshalling kiosk, online DGA module5set188,200.00941,000.00
3Inhibited mineral oil (IEC 60296), per unit fill including 5% topping reserve5fill112,920.00564,600.00
4Factory Acceptance Test execution, witnessing & FAT report5ea56,460.00282,300.00
5On-site commissioning engineer support — 5 days per unit25day9,410.00235,250.00
6Packaging, handling, transport to FCA point5ea9,410.0047,050.00
Total — fixed-price lump sum (matches §8 above)AED 9,410,000.00

All prices in AED, fixed-price for the contract duration. Tie-out: BoQ total of AED 9,410,000.00 matches Commercial Proposal §8 lump sum.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 10 · Delivery Schedule

Meridian HV Solutions commits to delivery of 30 weeks ARO (after receipt of order). The Gantt below sets out the milestone dates against this commitment.

WeekMilestoneCumulative
0Contract award · advance bond paid0%
4Engineering complete · drawings submitted10%
8Material POs placed · long-lead items secured22%
14Core/winding fabrication 50% complete40%
22Tank assembled, oil-filled, pre-FAT72%
24Unit 1 FAT — ACME witness78%
26Unit 3 FAT — ACME witness86%
28Unit 5 FAT — ACME witness92%
29Logistics handover, packaging, port loading97%
30Delivery to Northern Grid SS, Al Wathba100%

Note: The proposed lead time of 30 weeks is 4 weeks beyond the required 26-week window. Liquidated damages per §6 of the RFQ apply.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 11 · Reference Projects

ClientCountryVoltageMVAYearScope
PT PLN Indonesia 150/20 kV 60 2023 Java network reinforcement
EGAT Thailand Thailand 115/22 kV 50 2022 Bangkok ring expansion
KEPCO Korea 154/22.9 kV 60 2024 Incheon coastal
Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 11 · Reference Projects (continued)

The reference projects above represent only the most relevant 132 kV-class engagements in the last seven years. A full reference list with more than 80 projects across our active manufacturing programme is available on request, subject to confidentiality.

Client testimonials

  • "Delivered on time, FAT witnessed without remarks." — Reference Client A, 2023
  • "Professional handling of the on-site commissioning. Recommended." — Reference Client B, 2022
  • "Engineering responsiveness was strong throughout the contract." — Reference Client C, 2024
Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 12 · ICV Certificate

UAE In-Country Value Programme

Certificate of Compliance

ICV-AE-2025-MH-0917
Issued by Department of Energy

This is to certify that

Meridian HV Solutions

has been assessed for the UAE In-Country Value Programme as set out under Federal Decree No. 3 of 2017, and has achieved an In-Country Value Score of:

ICV Score: 22.0%
Issued on15 January 2025
Valid until2027-01-10
Audit firmPwC Middle East
Certificate validityOne year, renewable

This certificate confirms compliance with the ICV programme requirements as set out in the Procurement Standard. The score reflects the supplier’s contribution to the UAE economy through investment, in-country manufacturing, Emiratisation, and supplier diversity.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 13 · HSE Submission

HSMS standardISO 45001:2018
HSE policyReviewed annually; signed by CEO
LTI rate (last 3 years)0.8 per million man-hours
Major incidents (last 3 years)None
Method statements§14 of this submission
Risk registerLive, weekly review with site team
PPE policyACME-aligned; site induction mandatory
HSE trainingNEBOSH IGC for site management; IOSH for operatives

Meridian HV Solutions confirms its commitment to ACME HSE Standard S-HSE-VND Rev 6 throughout manufacturing, factory testing, transportation and on-site activities. Lifting plans for off-loading and positioning of transformers at site shall be approved by the Buyer’s HSE representative prior to mobilisation.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 14 · Method Statements — Manufacturing

14.1 Core fabrication

Grain-oriented silicon steel laminations are received under controlled humidity, inspected for surface integrity, and trim-cut against the design lamination plan. Step-lap mitres are applied at corners. The completed core is stress-relieved at 200 °C for 4 hours.

14.2 Winding fabrication

Continuously-transposed conductor (CTC) is wound on machined formers under controlled tension. Inter-disc and end-disc insulation is applied per the design pattern.

14.3 Tank assembly & oil-filling

Tank welds are X-ray inspected at agreed points. Hydraulic pressure test at 1.5× design pressure for 30 minutes. Vacuum dehydration prior to oil-fill.

14.4 Quality control gates

Six internal QC gates are observed: design freeze, material acceptance, core complete, winding complete, tank complete, and pre-FAT. Each gate produces an internal QC certificate.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 14.2 · Method Statements — Site Works

14.5 Off-loading at Northern Grid SS

Off-loading from the low-bed truck uses a 250-tonne mobile crane. The lift plan is reviewed by the ACME HSE representative prior to mobilisation. Spotters are positioned at all four corners of the pick-up area.

14.6 Positioning

Transformer is rolled to its plinth on greased steel skates with a hydraulic push-pull unit. Final positioning is confirmed against the GA drawing.

14.7 Oil-fill at site

Vacuum oil-fill is performed in three stages, with degassed oil pumped through a vacuum-treatment plant. Final oil sample is analysed for moisture and breakdown voltage prior to energisation.

14.8 Commissioning

Commissioning follows the SAT procedure agreed with ACME. Insulation resistance, ratio, oil DGA, and online DGA functional tests are performed. The on-site commissioning engineer is on-site for 5 days per unit, billed at the rate in §9 BoQ Item 5.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 15.1 · CV — Project Manager

NameWang Jianmin
RoleProject Manager — ACME D-TX-2026-0047
Years' experience20 years (12 in transformer manufacturing)
EducationBEng Electrical Engineering · MSc Power Systems
Professional registrationNational PE
PMI / Prince2PMP certified, 2018

Key 132 kV-class engagements

  • 132/33 kV, 5 × 40 MVA — Reference Client A, 2023 (PM)
  • 132/11 kV, 8 × 25 MVA — Reference Client B, 2022 (PM)
  • 132/33 kV, 6 × 31.5 MVA — Reference Client C, 2021 (Engineering Lead)
  • 110/22 kV, 12 × 60 MVA — Reference Client D, 2020 (Engineering Lead)
Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 15.2 · CVs — Lead Engineer & FAT Engineer

RoleNameYearsKey engagement
Lead EngineerEng. A. Roussos14132 kV-class winding design
FAT EngineerEng. M. Goldberg11IEC 60076-1 §10 FAT execution
Site CommissioningEng. L. Rocha8132 kV substation commissioning

Detailed CVs (3–4 pages each) are available on request, subject to GDPR/PDPA constraints.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 16 · Performance Bond Letter (Draft)

International Bank
Trade Finance · Bond Department

Date: 28 April 2026

Reference: PB-005-2026

To: ACME, Procurement Department, Abu Dhabi, UAE

RE: Performance Bond — RFQ D-TX-2026-0047 — Meridian HV Solutions

We hereby confirm that Meridian HV Solutions has been pre-approved for an irrevocable, on-demand performance bond of AED 941,000.00 (10% of contract value), valid through the warranty period and thirty (30) days thereafter, in connection with the above-referenced Request for Quotation.

This pre-approval is valid for issuance within 30 days of any contract award, against the standard ACME performance bond template.

Yours sincerely,

(stamped & signed)
Trade Finance Manager

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 17 · Warranty Terms

Warranty period2 years from SAT issue (or 30 months from delivery, whichever is earlier)
ScopeTransformer body only — accessories pro-rata
Critical-fault response96 hours
Replacement partsHeld in stock at our principal works; expedited shipment
On-line monitoringAvailable as paid service
Liability cap100% of contract value

The warranty does not cover damage caused by mis-operation outside the design envelope, lightning strikes outside the BIL withstand level, or loss arising from third-party intervention. The warranty is unconditional on the items in scope and is honoured worldwide.

Termination & force majeure

Standard ACME terms accepted. UAE law / ADGM courts as exclusive jurisdiction. No material reservations.

Confidential · for ACME procurement evaluation intl@meridian-hv.com

Section 18 · Appendices

Appendix A — General arrangement drawings

GA drawings, foundation loading details, and oil-cooler piping schematics are available as full A1 prints on contract award. Three A4 reductions are provided in the digital submission package.

Appendix B — Type-test curves

Lightning impulse, switching impulse, and chopped-wave curves from XJTU HV Lab Xi'an (report MH-XJTU-22-1411) are appended in the digital submission.

Appendix C — Material datasheets

Datasheets for the core steel, copper conductor, oil, paper, and bushing porcelain are included.

Closing

Meridian HV Solutions appreciates the opportunity to submit this bid. We look forward to ACME’s clarification questions and the opportunity to support the Northern Grid Switching Station programme.

— end of submission —