DashboardD-TX-2026-0047Phase 6 · Evaluation

HSE — Nexara

Generated by Aria · 4 checklist items · pack reviewed by Eng. Khaled Al-Romaithi

Evaluation pack

HSE

HSE record, method statements, COSHH, personnel certifications, incident history.

NP

Vendor
Nexara Power Systems
Tender ref.
D-TX-2026-0047
Generated
30 Apr 2026, 11:23 GST
Reviewer
Eng. Khaled Al-Romaithi
AI model
Schema
P6 v1.4 — IEC 60076 transformer pack
Overall recommendation · Recommended

ISO 45001-certified HSMS in place. Method statements provided for manufacturing and on-site activities. HSE record reviewed against UAE major project incident database.

HSE requirements

(ISO 45001 · Method statements · Personnel · Incident history)6/6 requirements met
RefRequirementStatusNoteRef
HSE-1ISO 45001:2018 HSMS certificate (or recognised equivalent)
Meets
BV-IMS-AF-2024 — issued by Bureau Veritas, 2024-11-03.
HSE-2ISO 14001 environmental management certificate
Meets
BV-IMS-AF-2024 — issued by Bureau Veritas, 2024-11-03.
HSE-3Manufacturing method statement (winding, core, oil processing)
Meets
Manufacturing method statement provided covering winding, core assembly, oil processing, and routine test stages.
HSE-4On-site method statement (installation, commissioning, emergency)
Meets
On-site method statement covers delivery, installation, oil filling, commissioning, and emergency response.
HSE-5Key personnel CVs & NEBOSH/IOSH competency evidence
Meets
CVs submitted for Project Manager and Lead Engineer; NEBOSH IGC certificates included.
HSE-63-year HSE incident history declaration (RIDDOR / equivalent)
Meets
Signed declaration submitted confirming no RIDDOR-reportable or equivalent incidents on transformer projects in the past 36 months.

Documents submitted

5/5 filed
DocumentStatus / detailRef
ISO 45001:2018 HSMS certificateBV-IMS-AF-2024 — Bureau Veritas
ISO 14001 environmental management certificateBV-IMS-AF-2024 — Bureau Veritas
Manufacturing method statementSubmitted with bid package.
On-site method statement & risk assessmentCovers installation through to energisation.
Key personnel CVsCVs filed for PM and Lead Engineer.
Submission completeness · 100%

All required submission items received.


AI assessment

  • H1.

    Does the supplier hold a current ISO 45001:2018 (or recognised equivalent) HSMS certificate?

    Meets

    "ISO 45001:2018 — BV-IMS-AF-2024 issued by Bureau Veritas."

    Independently audited HSMS in place — meets the Sec. 7 mandatory threshold.

  • H2.

    Method statements for manufacturing and site activities provided?

    Meets

    "Method statements per Appendix C — manufacturing, FAT, packaging, transport, and on-site lifting."

    Method statements are submitted in line with ACME HSE Standard S-HSE-VND Rev 6.

  • H3.

    Lifting plan for site off-loading at Northern Grid SS submitted?

    Meets

    "Lifting study and crane plan per Appendix D — submitted by lift planner."

    ACME HSE will validate the lift plan against site survey before approval; confirm crane availability windows.

  • H4.

    Personnel CVs — PM, Lead Engineer, FAT engineer — included with valid HSE qualifications?

    Meets

    "PM, Lead Engineer and FAT Engineer CVs — Appendix E."

    All required CVs are submitted. PM and FAT engineer have prior 132/33 kV experience.

This pack was drafted by Aria (, temperature 0.10) at the date and time stated above. Every claim contains a verbatim quote and source page reference from the vendor's bid PDF. Items where the source could not be matched to actual PDF content are shown as "Not Addressed" rather than rendered with an inferred citation, in line with ACME P-AI Procedure Sec. 4.

Reviewed by: Eng. Khaled Al-Romaithi · Pending sign-off.

Source viewer
Nexara bid · 38 pagespage 12
Open PDF
Nexara Power SystemsD-TX-2026-0047 · p. 12 of 38
Certifications

[Section excerpt]

Lorem ipsum technical text — IEC 60076-1, IEC 60076-3 references for the offered transformer. Specifications, type test report references, and FAT plan are inscribed below for the relevant clause.

↳ Cited passage (highlighted)

"ISO 45001:2018 — BV-IMS-AF-2024 issued by Bureau Veritas."

Continued: vendor declaration, schedule references, and signatory block on the following pages of this section.