Technical Review — Nexara
Generated by Aria · 5 checklist items · pack reviewed by Eng. Hamad Al-Suwaidi
Technical Review
Equipment compliance, spec deviations, FAT/SAT plan, technical risk.
96% clause-by-clause technical compliance against Sec. 3 of the RFQ. No declared deviations. Losses guaranteed at 26.4 kW NLL / 158.0 kW LL @ 75 °C.
RFQ specification requirements
(IEC 60076 · ACME Sec. 3)96% compliant| Clause | Requirement | Status | Vendor note | Ref |
|---|---|---|---|---|
| Sec. 3.1 | Vector group YNd11 | Complies | YNd11 confirmed | |
| Sec. 3.2 | Cooling class ONAN/ONAF | Complies | ONAN/ONAF, 100% at ONAN | |
| Sec. 3.3 | Insulation system | Complies | Inhibited mineral oil per IEC 60296 | |
| Sec. 3.4 | BIL HV/LV | Complies | 650 / 170 kVp confirmed | |
| Sec. 3.5 | Losses (no-load / load) | Complies | 26.4 kW / 158 kW @ 75 °C | |
| Sec. 3.6 | Short-circuit impedance | Complies | 12.4% on principal tap | |
| Sec. 3.7 | Bushing specification | Complies | OIP, IEC 60137 | |
| Sec. 3.8 | Tap changer | Complies | OLTC, ±9 × 1.25%, motor-driven, vacuum | |
| Sec. 3.9 | FAT per IEC 60076-1 Sec. 10 | Complies | Witness welcome; lightning-impulse, SC withstand included | |
| Sec. 3.10 | Environmental conditions | Complies | Designed for 50 °C ambient, dust class B |
Certifications submitted
2 filed| Certification | Report No. | Issuing laboratory | Date | Ref | |
|---|---|---|---|---|---|
| IEC 60076-1/2/3/5 type tests | AF-LIPL-22-1184 | KEMA Labs Arnhem | 2024-08-12 | ||
| ISO 9001:2015 / ISO 14001 / ISO 45001 | BV-IMS-AF-2024 | Bureau Veritas | 2024-11-03 |
All required submission items received.
AI assessment
- T1.Meets
Does the offered transformer comply with vector group YNd11 per Sec. 3.1?
"Vector group: YNd11 — confirmed."
Vector group as specified. Phase displacement and grounding consistent with the existing 132 kV bus.
- T2.Meets
Are guaranteed losses within Sec. 3.5 tolerances (NLL ≤ 28 kW, LL ≤ 165 kW)?
"Guaranteed: 26.4 kW NLL / 158.0 kW LL @ 75 °C."
Losses are within spec. The bid offers best-in-cohort efficiency.
- T3.Meets
Bushing specification per Sec. 3.7 — is OIP (or RIS preferred) offered?
"OIP HV / Resin LV — Trench RIS available"
Bushing type aligns with Sec. 3.7 expectations.
- T4.Meets
FAT plan per IEC 60076-1 Sec. 10 with ACME witness points scheduled?
"FAT performed at KEMA Labs Arnhem per IEC 60076-1 Sec. 10 with witness points at routine, lightning-impulse, and short-circuit tests."
FAT scope and witness points consistent with ACME standard procedure.
- T5.Partially meets
Type test reports current and from an accredited lab?
"IEC 60076-1/2/3/5 type tests — AF-LIPL-22-1184, KEMA Labs Arnhem, 2024-08-12."
Type tests cover -1/-2/-3 only. IEC 60076-5 short-circuit witnessed test is not on file.
This pack was drafted by Aria (, temperature 0.10) at the date and time stated above. Every claim contains a verbatim quote and source page reference from the vendor's bid PDF. Items where the source could not be matched to actual PDF content are shown as "Not Addressed" rather than rendered with an inferred citation, in line with ACME P-AI Procedure Sec. 4.
Reviewed by: Eng. Hamad Al-Suwaidi · Pending sign-off.
[Section excerpt]
Lorem ipsum technical text — IEC 60076-1, IEC 60076-3 references for the offered transformer. Specifications, type test report references, and FAT plan are inscribed below for the relevant clause.
"Vector group: YNd11 — confirmed."
Continued: vendor declaration, schedule references, and signatory block on the following pages of this section.