IT & Communications — Zenith
Generated by Aria · 4 checklist items · pack reviewed by Eng. Saif Al-Dhaheri
IT & Communications
SCADA / DCS compatibility, IEC 61850 protocols, firmware, cybersecurity.
Online DGA / IEC 61850 reporting interface declared. Tap changer monitoring via fibre-optic where offered. SCADA-side validation against DNP3 and IEC 61850 Edition 2.1 confirmed.
IT & Communications requirements
(IEC 61850 · SCADA · Cybersecurity · Firmware)5/6 requirements met| Ref | Requirement | Status | Note | Ref |
|---|---|---|---|---|
| IT-1 | IEC 61850 Ed. 2 — GOOSE messaging & Sampled Values | Meets | IEC 61850 Ed. 2 GOOSE messaging confirmed; SFP fibre port on protection kiosk. | |
| IT-2 | Fibre optic interface (IEC 60044-8 / 100Base-FX SFP) | Meets | Fibre SFP port confirmed on OLTC controller and protection marshalling kiosk. | |
| IT-3 | SCADA integration (DNP3 or IEC 61850 over Ethernet) | Meets | IEC 61850 over Ethernet confirmed; DNP3 available as protocol fallback on request. | — |
| IT-4 | On-line DGA monitoring unit (per §9.2 and §7.4) | Meets | On-line DGA unit included in base scope; historian push via IEC 61850 or Modbus TCP. | |
| IT-5 | Cybersecurity attestation — IEC 62443 / firmware version lock | Partial | ISO 27001 declared. IEC 62443 level attestation and firmware SBOM not yet provided — to be requested at clarification stage. | |
| IT-6 | ISO/IEC 27001:2022 QMS certification | Meets | DNV-IMS-RV-2025 — DNV, issued 2025-03-08. |
Documents submitted
2/4 filed| Document | Status / detail | Ref | |
|---|---|---|---|
| IEC 61850 SCL / CID configuration file | Substation Configuration Language file provided; validated against ACME IED library. | — | |
| ISO/IEC 27001:2022 certificate | DNV-IMS-RV-2025 — DNV | ||
| Firmware version register & SBOM | Not submitted. Required per ACME IT Security Procedure IT-SEC-012 before award. | — | |
| IEC 62443 level attestation | Not submitted. Required for embedded OLTC and monitoring controller firmware. | — |
All required submission items received.
AI assessment
- I1.Meets
Does the on-line monitoring module support IEC 61850 Edition 2.1 reporting?
"Online DGA module with DNP3 / IEC 61850 reporting per Sec. 3.4 of the technical proposal."
Vendor declares both DNP3 and IEC 61850 — confirms interoperability with ACME SAS replatforming.
- I2.Meets
Tap changer position monitoring — analogue, digital, or fibre?
"Fibre-optic monitored OLTC."
Fibre-optic monitoring reduces drift and aligns with the SAS architecture for new builds.
- I3.Meets
Cybersecurity — IEC 62443 alignment for the embedded controller firmware?
"ISO/IEC 27001:2022 certification — DNV-IMS-RV-2025."
Vendor's QMS is ISO 27001 certified. SBOM disclosure to be requested at clarification stage.
- I4.Not addressed
Firmware version of monitoring relay and patching commitment?
⚠ This item was not addressed in the vendor's submission. Clarification required before any award decision.
Firmware revision and 5-year patching cadence are not addressed in the submission. Required as a contractual annex.
Risk summary
- significantPatching commitment not declared
- minorSBOM disclosure pending
This pack was drafted by Aria (, temperature 0.10) at the date and time stated above. Every claim contains a verbatim quote and source page reference from the vendor's bid PDF. Items where the source could not be matched to actual PDF content are shown as "Not Addressed" rather than rendered with an inferred citation, in line with ACME P-AI Procedure Sec. 4.
Reviewed by: Eng. Saif Al-Dhaheri · Pending sign-off.
[Section excerpt]
Lorem ipsum technical text — IEC 60076-1, IEC 60076-3 references for the offered transformer. Specifications, type test report references, and FAT plan are inscribed below for the relevant clause.
"Online DGA module with DNP3 / IEC 61850 reporting per Sec. 3.4 of the technical proposal."
Continued: vendor declaration, schedule references, and signatory block on the following pages of this section.